The Philadelphia Chapter of the PRRT&HS expresses its
sincere thanks to Bennett Levin
for granting his permission to publish the
restoration process of PRR 5809.
Photos from September 26, 2000
By Steve Agostini
This is it,
the last photo series of NS 1000 in primer.
A final
inspection before applying roof sealer and primer. The unit must be
prepped in sections allowing each area to thoroughly dry before
applying the
first coat of finish.
Primer being
applied to roof. Lift platform operator and painter work in
unison with little or no verbal conversation.
Forklift
equipped with a standing platform is positioned on fireman's side.
Forklift
operator moves painter along the unit.
Lift
operator also moves painter along the unit.
Paint mixing
area.
Painter
positioning for roof application.
Painter must move
to back of locomotive as lift operator and forklift operator move along
in unison.