Restoration of PRR 5711A class EP22
| |
|
This next set of photos cover the work in installing the portholes. | |
|
Once the sides were opened up, the next step was to install the frames. | |
|
Work space is somewhat cramped and limited. | |
|
|
|
|
|
|
| Machinist Keith Fee sanding and grit blasting. | |
| Porthole and batten. | |
| Machinist Eric Levin drilling handhold bolt holes. | |
| Machinist/Painter Al Hillman. | |
| Hillman and Levin setting porthole frames. | |
| The EP22 is beginning to look more like the 1953 factory model. | |
| Electrical equipment had to be relocated from behind the portholes. | |
| Hillman and Levin setting porthole frames. | |
| All eight portholes were installed in two days. | |