Restoration of PRR 5711A class EP22
| |
|
Most all of the following photos highlight the amount of grinding that occurred during the last six days. All welds, as we know, must be surface ground and reinspected. | |
|
Engine room door threshold. | |
|
Machinist Hillman prepping engine room door. | |
| Body plastic is now being applied. It will take at least five weeks to finish the nose. | |
| Machinist Hillman prepping engine room door. | |
| All welds are inspected and redone where necessary. | |
| Painter Bob Fee applying body plastic. | |
| Machinist Levin scratch building fabricating electrical boxes for lighting. | |
| Reclaimed materials. | |